Shows buses, trolleybuses, and trams via GPS
Shows buses, trolleybuses, and trams via GPS
The service shows the location of buses, trolleybuses, and trams via the GPS/GLONASS satellite positioning system. You can find out where public transport is going and decide when to go to the stop.

| start - end / header / cause / effect | description |
|---|---|
| - The following stop is closed beginning Wed Jan 8 due to construction: Washington St & 47th Ave (#17169) (northbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>7
<br><br>Available alternate stops:
<br>Temporary bus stop located south of 47th Ave near DenCol Building
<br>Washington St & 45th Ave (#17167)
<br>Washington St & 49th Ave (#22041) Bus 7 |
| - The following stop is closed through Thu Dec 30 2027 due to construction: Colfax Ave & Elm St (#12875) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15
<br><br>Available alternate stops:
<br>Colfax Ave & Glencoe St (#12882) (westbound)
<br>Colfax Ave & Cherry St (#12858) (westbound) Bus 15 |
| - The following stop is closed through Thu Dec 30 2027 due to construction: Colfax Ave & Elm St (#12875) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15L
<br><br>Available alternate stops:
<br>Colfax Ave & Glencoe St (#12882)
<br>Colfax Ave & Colorado Blvd (#12865) Board at E. Colfax Ave & Colorado Blvd Temp Stop on the west side of Colorado Blvd. Bus 15L |
| - The following stop is closed through Fri Jul 30 due to construction: South Golden Rd & W 12th Ave (#15701) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>17
<br><br>Available alternate stops:
<br>South Golden Rd & Quaker St (#15722)
<br>South Golden Rd & Ulysses St (#15727) Bus 17 |
| - The following stop is closed due to construction: South Golden Rd & Isabell St (#15713) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>17
<br><br>Available alternate stops:
<br>Indiana St & S Golden Rd (#23675)
<br>South Golden Rd & Camp George West (#15704) Bus 17 |
| - The following stop is closed due to construction: S Peoria St & S Parker Rd (#15949) (northbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>121
<br>130
<br><br>Available alternate stops:
<br>Nine Mile Station Gate G (#26197) (northbound)
<br>S Peoria St & Cornell Ave (#22323) (northbound)
<br>Nine Mile Station Gate D (#26195) (northbound) Bus 121Bus 130 |
| - The following stop is closed due to construction: CO 119 & Monarch Rd (#24826) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>BOLT
<br><br>Available alternate stops:
<br>Temporary stop north of Monarch Rd
<br>CO 119 & Niwot Rd PnR (#18095)
<br>CO 119 & 63rd St (#18010) Bus BOLT |
| - The following stop is closed beginning Mon Feb 2 - Aug 2028 due to construction: Walnut St & 40th Ave (#34428) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>ART
<br><br>Available alternate stops:
<br>York St & 40th Ave (#11103)
<br>Walnut St & 38th St (#17119) Bus ART |
| - Change at Table Mesa Station beginning Mon Mar 23. UNKNOWN_CAUSEUNKNOWN_EFFECT | RTD will begin work March 23 to perform structural repairs at the Table Mesa Park-n-Ride. To ensure customer safety, the 18-month project will require temporary closure of the station plaza area and relocation of some bus gates.
<br><br>Work to be completed includes improvements to the front stair tower on the north side of the parking structure, steel repairs to the awning that covers the plaza, and replacement of roofing, along with some structural concrete repairs in isolated locations within the parking garage. For the duration of the project, bus gates B and C in front of the parking garage will be temporarily closed.
<br><br> Customers arriving via the Flatiron Flyer (FF) or Airport (AB) routes will deboard at the bus stop located along Table Mesa Drive across from the Park-n-Ride.
<br><br> Eastbound customers departing on FF or AB routes will board at the south ramp boarding plaza on the south side of U.S. 36. Customers can take an elevator to Level 4 of the Park-n-Ride garage to access the pedestrian bridge over US 36 to the south ramp boarding plaza. Westbound customers will board at Gate E along Table Mesa Drive
<br><br>The project is estimated to be completed in September 2027. Details and project updates are available on RTD’s
<br>website. Bus FF2Bus AB1Bus AB3Bus FF1Bus FF5Bus AB2Bus FF4 |
| - The following stop is closed beginning Mon Mar 30 due to construction: 28th St & Mapleton Ave (#10729) (eastbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>205
<br><br>Available alternate stop:
<br>28th St & Spruce St (#25325) Bus 205 |
| - Change at Orchard Station beginning Thu Mar 26 due to construction. CONSTRUCTIONUNKNOWN_EFFECT | RTD is coordinating with local partners Goldsmith Metropolitan District and the City of Greenwood Village to ensure customer access to light rail during a six-month project to redevelop the green space at Orchard Station Park beginning March 26. Light rail service will not be affected by the project.
<br><br>During the initial phase of work, which includes construction of a sound wall along I-25, crews will work to minimize disruptions and maintain access whenever possible. The park will be closed during the second phase, which includes improvements to landscaping and walkways and creation of a new pond and seating area.
<br><br>While the project is underway, light rail customers can follow posted detours around the perimeter of the construction site to travel to and from the Orchard Station pedestrian bridge. Tram TTram RTram E |
| - The following stop is closed until the contractor rebuilds the sidewalk, the stop does not meet Federal ADA compliance: 15th St & Stout St [ Y Stop ] (#17703) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>10
<br>28
<br>38
<br>43
<br>44
<br><br>Available alternate stops:
<br>Temporary stop on 15th St at Arapahoe St
<br>15th St & Glenarm Pl [ Y Stop ] (#17700) (westbound)
<br>California St & 17th St (#17733) (westbound)
<br>Lawrence St & 16th Street Mall (#17752) (westbound)
<br>Larimer St & 12th St (#35474) (westbound) Bus 44Bus 32Bus 28Bus 10Bus 38Bus 43 |
| - The following stop is closed from Mon Jun 15 through Tue Oct 27 due to construction: 3800 Block S Chambers Rd (#19611) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>153
<br><br>Available alternate stops:
<br>S Chambers Rd & Hampden Cir (#19612)
<br>S Chambers Rd & Nassau Ave (#19613) Bus 153 |
| - Route 153 detoured through Thu Apr 29 due to construction at the intersection of Arapahoe Rd & S Revere Pkwy CONSTRUCTIONDETOUR | Affected stops:
<br>S Revere Pkwy & Arapahoe Rd (#33464) (northbound)
<br>Arapahoe Rd & S Revere Pkwy (#20463) (southbound)
<br><br>For northbound Route 153 get on/off buses at:
<br>Arapahoe Rd & S Peoria St (#21499)
<br>Briarwood Ave & S Revere Pkwy (#22047)
<br><br>For southbound Route 153 get on/off buses at:
<br>Briarwood Ave & S Revere Pkwy (#22048)
<br>Arapahoe Rd & S Peoria St (#21504) Bus 153 |
| - Route 11 detoured from Mon Jul 6 through Thu Dec 10 due to road closure on Mississippi Ave between Oneida St and Monaco Pkwy. OTHER_CAUSEDETOUR | Affected stops:
<br>Mississippi Ave & S Monaco Pkwy (#15410) (eastbound)
<br>Mississippi Ave & S Oneida St (#15417) (westbound)
<br><br>For eastbound Route 11 get on/off buses at:
<br>Mississippi Ave & S Leyden St (#15397)
<br>Mississippi Ave & S Oneida St (#15416)
<br><br>For westbound Route 11 get on/off buses at:
<br>Mississippi Ave & S Quebec St (#15428)
<br>Mississippi Ave & S Monaco Pkwy (#15411) Bus 11 |
| - Route 8 detoured both directions due to safety concerns on Chestnut Pl at 28th St. UNKNOWN_CAUSEDETOUR | Affected stops:
<br>Park Ave West & Blake St (#23224) (northbound)
<br>Chestnut Pl & 28th St (#35571) (northbound)
<br>Chestnut Pl & 28th St (#35572) (southbound)
<br><br>For northbound Route 8 get on/off buses at:
<br>Park Ave West & Lawrence St (#23223)
<br>Platte Maintenance Lot (#25838)
<br><br>For southbound Route 8 get on/off buses at:
<br>Platte Employee Lot (Ar) (#16327)
<br>22nd St & Larimer St (#23221) Bus 8 |
| - The following stop is closed from Mon Jul 6 through Fri Nov 6 due to construction: S Broadway & W Oxford Ave (#12573) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>0B
<br><br>Available alternate stops:
<br>S Broadway & W Mansfield Ave (#12558)
<br>S Broadway & W Quincy Ave (#12584) Bus 0B |
| - Route 21 service change: In an effort to better accommodate passenger loads and traffic in the station, Gate A will now be the new assigned location for boarding and alighting passengers. UNKNOWN_CAUSEUNKNOWN_EFFECT | Affected direction: Eastbound
<br><br>Affected stops:
<br>Evans Station Gate C (#26300) Bus 21 |
| - Route 22 service change: In an effort to better accommodate passenger loads and traffic in the station, Gate C will now be the new assigned location for boarding and alighting passengers. UNKNOWN_CAUSEUNKNOWN_EFFECT | Affected direction: Eastbound
<br><br>Affected stops:
<br>Evans Station Gate A (#24987) Bus 22 |
| - The following stops are closed from Tue Jul 14 through Tue Dec 1 due to construction: Pace St & E 17th Ave (#25166) (westbound) and Pace St & Red Oak Dr (#25167) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>323 Bus 323 |
| - Route 9 detoured through Wed Oct 28 due to road closure on Decatur St between 8th Ave & 10th Ave OTHER_CAUSEDETOUR | Affected stops:
<br>W 10th Ave & Federal Blvd (#10044) (eastbound)
<br>Decatur St & W 10th Ave (#25926) (eastbound)
<br>Decatur St & W 8th Ave (#13350) (westbound)
<br>W 10th Ave & Decatur St (#10038) (westbound)
<br><br>For eastbound Route 9 get on/off buses at:
<br>W 10th Ave & Hooker St (#10050)
<br>W 8th Ave & Decatur St (#11841)
<br><br>For westbound Route 9 get on/off buses at:
<br>W 8th Ave & Bryant St (#25409)
<br>W 10th Ave & Federal Blvd (#10045) Bus 9 |
| - 104th & Highway 2 railroad crossing detour, when needed. OTHER_CAUSEDETOUR | Affected direction: Westbound
<br>Eastbound stops are not affected.
<br><br>Affected stops:
<br>104th Ave & Revere St (#33175)
<br><br>Available alternate stops:
<br>104th Ave & Blackhawk St (#26208)
<br>104th Ave & Joliet St (#35510) Bus 104L |
| - The following stop is closed through Thu Apr 29 due to construction: Arapahoe Rd & S Revere Pkwy (#20463) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>169
<br><br>Available alternate stops:
<br>S Lewiston Way & Mccallin Gate (#33940) (southbound)
<br>Arapahoe Rd & S Peoria St (#21504) (southbound) Bus 169 |
| - The following stop is closed due to construction: Colfax Ave & Peoria St (#12955) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15
<br>15L
<br><br>Board at temporary stop located near Oswego St Bus 15Bus 15L |
| - The following stop is closed due to construction: Colfax Ave & Havana St (#12894) (eastbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15
<br>15L
<br>Temporary stop located near Ironton St Bus 15Bus 15L |
| - Route 225D detoured from Mon Aug 3 through Fri Oct 30 due to road closure on Baseline Rd at Cherryvale Rd OTHER_CAUSEDETOUR | Affected stops:
<br>Cherryvale Rd & Baseline Rd (#22863) (eastbound)
<br>Baseline Rd & Platt Middle School (#22859) (eastbound)
<br>Baseline Rd & Stearns Ave (#22817) (eastbound)
<br>Baseline Rd & Lakeview Dr (#22819) (eastbound)
<br>6800 Block Baseline Rd (#22821) (eastbound)
<br>Baseline Rd & Mallard Pond Dr (#22823) (eastbound)
<br>Baseline Rd & 75th St (#22825) (eastbound)
<br>Baseline Rd & 75th St (#22826) (westbound)
<br>Baseline Rd & Mallard Pond Dr (#22824) (westbound)
<br>6800 Block Baseline Rd (#22822) (westbound)
<br>Baseline Rd & Lakeview Dr (#22820) (westbound)
<br>Baseline Rd & Stearns Ave (#22818) (westbound)
<br>Baseline Rd & Platt Middle School (#22860) (westbound)
<br>Cherryvale Rd & Dimmit Dr (#22814) (westbound)
<br><br>For eastbound Route 225 get on/off buses at:
<br>Baseline Rd & Cherryvale Rd (#22812)
<br>Baseline Rd & Wewoka Dr (#22827)
<br><br>For westbound Route 225 get on/off buses at:
<br>Baseline Rd & Wewoka Dr (#22828)
<br>Baseline Rd & Cherryvale Rd (#22813) Bus 225D |
| - Route 225 detoured from Mon Aug 3 through Fri Oct 30 due to construction. CONSTRUCTIONDETOUR | Affected stops:
<br>Cherryvale Rd & Baseline Rd (#22863) (eastbound)
<br>Baseline Rd & Platt Middle School (#22859) (eastbound)
<br>Baseline Rd & Stearns Ave (#22817) (eastbound)
<br>Baseline Rd & Lakeview Dr (#22819) (eastbound)
<br>6800 Block Baseline Rd (#22821) (eastbound)
<br>Baseline Rd & Mallard Pond Dr (#22823) (eastbound)
<br>Baseline Rd & 75th St (#22825) (eastbound)
<br>Baseline Rd & 75th St (#22826) (westbound)
<br>Baseline Rd & Mallard Pond Dr (#22824) (westbound)
<br>6800 Block Baseline Rd (#22822) (westbound)
<br>Baseline Rd & Lakeview Dr (#22820) (westbound)
<br>Baseline Rd & Stearns Ave (#22818) (westbound)
<br>Baseline Rd & Platt Middle School (#22860) (westbound)
<br>Cherryvale Rd & Dimmit Dr (#22814) (westbound)
<br><br>For eastbound Route 225 get on/off buses at:
<br>Baseline Rd & Cherryvale Rd (#22812)
<br>Baseline Rd & Wewoka Dr (#22827)
<br><br>For westbound Route 225 get on/off buses at:
<br>Baseline Rd & Wewoka Dr (#22828)
<br>Baseline Rd & Cherryvale Rd (#22813) Bus 225 |
| - The following stop is closed beginning Fri Jul 31 to Dec 2027 due to construction: Bannock St & W 5th Ave (#12325) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>52
<br><br>Available alternate stops:
<br>Bannock St & W 3rd Ave (#12323)
<br>Bannock St. & 7th Ave (#12331) Bus 52 |
| - Route 32 detoured due to construction. CONSTRUCTIONDETOUR | Affected direction: Eastbound
<br><br>Affected stops:
<br>W 32nd Ave & Wadsworth Blvd (#10923)
<br>W 32nd Ave & Teller St (#10918)
<br><br>Available alternate stops:
<br>Olde Town Arvada Stn Gate D (#34537)
<br>W 32nd Ave & Pierce St (#10905) Bus 32 |
| - Route 12 detoured due to construction. CONSTRUCTIONDETOUR | Affected stops:
<br>S Downing St & Colorado Ave (#13395) (northbound)
<br>Iowa Ave & S Downing St (#14582) (northbound)
<br>S Downing St & Iowa Ave (#13412) (southbound)
<br>S Downing St & Colorado Ave (#13396) (southbound)
<br><br>For northbound Route 12 get on/off buses at:
<br>S Downing St & Evans Ave (#13401)
<br>Iowa Ave & S Washington St (#14593)
<br><br>For southbound Route 12 get on/off buses at:
<br>Iowa Ave & S Pearl St (#14592)
<br>S Downing St & Evans Ave (#13400) Bus 12 |
| - The following stops are closed through Fri Oct 30 due to construction: 4 Bus stops. CONSTRUCTIONNO_SERVICE | Affected routes:
<br>120L
<br>145X
<br><br>Affected stops:
<br>Sable Blvd & 136th Ave (#24532) (northbound)
<br>Sable Blvd & 144th Ave (#24533) (northbound)
<br>Sable Blvd & 144th Ave (#24526) (southbound)
<br>Sable Blvd & 136th Ave (#24527) (southbound)
<br><br>Available alternate stops:
<br>Sable Blvd & 132nd Ave (#24531) (northbound)
<br>Sable Blvd & Bromley Ln (#26414) (northbound)
<br>Sable Blvd & Bromley Ln (#26415) (southbound)
<br>Sable Blvd & 132nd Ave (#24528) (southbound) Bus 145XBus 120L |
| - Route 12 detoured from Mon Aug 17 through Wed Oct 21 due to a construction road closure on Hampden between Broadway and Logan St OTHER_CAUSEDETOUR | Affected stops:
<br>Hampden Ave & S Sherman St (#20173) (northbound)
<br>Hampden Ave & S Sherman St (#25212) (southbound)
<br>S Lincoln St & Girard Ave (#25562) (southbound)
<br><br>For northbound Route 12 get on/off buses at:
<br>Girard Ave & S Lincoln St (#20728)
<br>Hampden Ave & S. Pearl St (#14168)
<br><br>For southbound Route 12 get on/off buses at:
<br>Hampden Ave & S Pennsylvania St (#14169)
<br>Englewood Pkwy & S Acoma St (#20093) Bus 12 |
| - Route 12 detoured from Mon Aug 17 through Wed Oct 21 due to a construction road closure on Hampden between Broadway and Logan St OTHER_CAUSEDETOUR | Affected stops:
<br>Hampden Ave & S Sherman St (#20173) (eastbound)
<br>Hampden Ave & S Sherman St (#25212) (westbound)
<br>S Lincoln St & Girard Ave (#25562) (westbound)
<br><br>For eastbound Route 35 get on/off buses at:
<br>Girard Ave & S Lincoln St (#20728)
<br>Hampden Ave & S. Pearl St (#14168)
<br><br>For westbound Route 35 get on/off buses at:
<br>Hampden Ave & S Pennsylvania St (#14169)
<br>Englewood Pkwy & S Acoma St (#20093) Bus 35 |
| - Real-time information for N Line is incomplete UNKNOWN_CAUSEOTHER_EFFECT | Train N |
| - Route 225D detoured from Mon Sep 7 through Wed Oct 28 due to construction. CONSTRUCTIONDETOUR | Affected direction: Eastbound
<br><br>Affected stops:
<br>Aspen Ridge Dr & Black Diamond Dr (#34416)
<br>Diamond Cir & Aspen Ridge Dr (#34390)
<br><br>Available alternate stops:
<br>Baseline Rd & Anna Thomas Pkwy (#33155)
<br>Baseline Rd & Crossing Dr (#17969) Bus 225D |
| - Route 228A detoured from Mon Sep 7 through Wed Oct 28 due to construction. CONSTRUCTIONDETOUR | Affected direction: Northbound
<br><br>Affected stops:
<br>Aspen Ridge Dr & Black Diamond Dr (#34416) Bus 228A |
| - Change at Wheat Ridge-Ward Station Gate G (#34517) (eastbound) and Wheat Ridge-Ward Station Gate H (#34518) (westbound) Board and alight at Gate D for both eastbound and westbound trips. UNKNOWN_CAUSEUNKNOWN_EFFECT | <br>Affected routes:
<br>72 Bus 72 |
| - ART detoured from Tue Sep 1 through Tue Mar 30 due to construction. CONSTRUCTIONDETOUR | Affected direction: Northbound
<br><br>Affected stops:
<br>Stout St & 14th St (#17759)
<br><br>Available alternate stops:
<br>Stout St & W Colfax Ave (#14724)
<br>Stout St & 16th Street (#17760) Bus ART |
| - The following stop is closed through Wed Oct 28 due to construction: Evans Ave & S Franklin St (#13583) (eastbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>21
<br><br>Available alternate stops:
<br>Evans Ave & S Downing St (#13577)
<br>Evans Ave & S High St (#13587) Bus 21 |
| - The following stop is closed through Sat Oct 31 due to construction: Colfax & Moline Station (#12934) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15
<br>15L
<br><br>Please board at the Temporary stop on the east side, nearside, of Moline St. Bus 15Bus 15L |
| - The following stops are closed due to construction: 5 Bus stops. CONSTRUCTIONNO_SERVICE | Affected routes:
<br>225
<br>225D
<br>228A
<br><br>Affected stops:
<br>Baseline Rd & N 95th St (#22839) (eastbound)
<br>Baseline Rd & Indian Peaks Dr (#22843) (eastbound)
<br>Baseline Rd & Gold Hill Dr (#23998) (eastbound)
<br>Baseline Rd & Anna Thomas Pkwy (#33155) (eastbound)
<br>Baseline Rd & Caria Dr (#21872) (eastbound)
<br><br>Available alternate stops:
<br>Baseline Rd & Roser Dr (#33366) (eastbound)
<br>Baseline Rd & Crossing Dr (#17969) (eastbound) Bus 228ABus 225Bus 225D |
| - Change at Colfax Ave & Krameria St (#12922) (westbound). CONSTRUCTIONUNKNOWN_EFFECT | Bus Stop sign located on temporary ramp near Jasmine St. Please board at this location for stop 12922.
<br><br>Affected routes:
<br>15
<br>15L Bus 15Bus 15L |
| - The following stop is closed through Tue Oct 27 due to construction: Yale Ave & S Holly St (#17321) (northbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>46
<br><br>Available alternate stops:
<br>Yale Ave & S Krameria St (#17333)
<br>Yale Ave & S Hudson St (#17325) Bus 46 |
| - Route 0 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Reason
<br>Schedule changes will eliminate overlap with Route 0L.
<br><br>Survey Results
<br>Since this change was not included in the proposed September Service Changes, no survey data was collected. Bus 0 |
| - Route 1 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Reason
<br>Improve on-time performance and service reliability.
<br><br>Survey Results
<br>Out of 12 respondents, 67% reported a positive impact from the change, 33% indicated it had no impact, and 0% perceived the change negatively. Bus 1 |
| - Route 9 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Bus stops will be realigned to serve alternating "Z" stops in Downtown Denver, with service at Union Station relocating to Gate 9. The following stops will no longer be served in the Eastbound direction: 15th St & Tremont Pl (17699), 15th St & California St (17702), and 15th St & Curtis St (17705). The following stops will no longer be served in the Westbound direction: 17th St & Champa St (17714) and 17th St & Welton St (17711).
<br><br>Reason
<br>Better serve alternating stops in Downtown Denver. The 9 will serve the same stops as the routes 0 and 52. So customers headed to south can wait at these bus stops and choose between any of those three route options, whichever arrives next.
<br><br>Survey Results
<br>Out of 14 respondents, 50% reported a positive impact from the change, 36% indicated it had no impact, and 14% perceived the change negatively. Bus 9 |
| - Route 10 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route 10 will be rerouted to Decatur•Federal Station as the western terminal via Auraria Pkwy., West Colfax Ave., and Federal Blvd.
<br><br>Reason
<br>Provide bus connection from Downtown to Decatur/Federal to replace discontinued segment of Route 15L.
<br><br>Survey Results
<br>Out of 27 respondents, 37% reported a positive impact from the change, 7% indicated it had no impact, and 56% perceived the change negatively. Bus 10 |
| - Route 11 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules with reinstatement of seasonal tripper service.
<br><br>Reason
<br>Improve on-time performance and service reliability while aligning with seasonal ridership levels at South High School.
<br><br>Survey Results
<br>Out of 8 respondents, 50% reported a positive impact from the change, 50% indicated it had no impact, and 0% perceived the change negatively. Bus 11 |
| - Route 14 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Reason
<br>Improve on-time performance and service reliability.
<br><br>Survey Results
<br>Out of 8 respondents, 63% reported a positive impact from the change, 38% indicated it had no impact, and 0% perceived the change negatively. Bus 14 |
| - Route 15 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Bus-Only Lane Operations (BOLO) will be implemented along Colfax Avenue between Broadway and Colorado Blvd., and western segment of route that serves Decatur•Federal station will be discontinued.
<br><br>Note: Starting September 27, 15 and 15L buses will use new center bus-only lanes between Broadway and Colorado Blvd. Customers will board and exit at the new stations in the center of Colfax Avenue, current stops along the sidewalks of Colfax Avenue will be removed and not serviced by either route.
<br><br>Reason
<br>Support East Colfax Bus-Only Lane Operations (BOLO) per progression of Bus Rapid Transit Project.
<br><br>Survey Results
<br>Out of 64 respondents, 64% reported a positive impact from the change, 13% indicated it had no impact, and 21% perceived the change negatively. Bus 15 |
| - Route 15L service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Service rerouted to serve Union Station and Bus-Only Lane Operations (BOLO) will be implemented along Colfax Avenue between Broadway and Colorado Blvd.
<br><br>Note: Starting September 27, 15 and 15L buses will use new center bus-only lanes between Broadway and Colorado Blvd. Customers will board and exit at the new stations in the center of Colfax Avenue, current stops along the sidewalks of Colfax Avenue will be removed and not serviced by either route.
<br><br>Reason
<br>Support East Colfax Bus-Only Lane Operations (BOLO) per progression of Bus Rapid Transit Project, with changes to Route 10 serving the portion of discontinued route.
<br><br>Survey Results
<br>Out of 28 respondents, 61% reported a positive impact from the change, 18% indicated it had no impact, and 22% perceived the change negatively. Bus 15L |
| - Route 20 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>It is proposed to split the existing Route 20 into Route 20 and Route 23, with Route 20 serving the eastern portion of the route. Decatur•Federal would serve as the western terminal via 15th St., Platte St., Water St., I-25, West Colfax Avenue, and Federal Blvd. Seasonal tripper service reinstated with morning tripper times adjusted.
<br><br>Reason
<br>Provide bus connection from Downtown to Decatur/Federal to Replace Route 15L. Better serve East High School morning bell times.
<br><br>Survey Results
<br>Out of 43 respondents, 40% reported a positive impact from the change, 14% indicated it had no impact, and 47% perceived the change negatively. Bus 20 |
| - Route 24 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Reinstate seasonal tripper service.
<br><br>Reason
<br>Align with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 17 respondents, 24% reported a positive impact from the change, 65% indicated it had no impact, and 12% perceived the change negatively. Bus 24 |
| - Route 32 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Western terminal will be relocated from Old Town Arvada Station to Clear Creek Crossing Transfer Center in Wheat Ridge via 32nd Avenue.
<br><br>Reason
<br>Extends access to Wheat Ridge and facilitates transfers to the 72 and 38 at Clear Creek Crossing Transfer Center.
<br><br>Survey Results
<br>Out of 16 respondents, 82% reported a positive impact from the change, 13% indicated it had no impact, and 6% perceived the change negatively. Bus 32 |
| - Route 35 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Seasonal tripper service will be reinstated, with an additional morning trip added to help alleviate overcrowding around John F. Kennedy High School’s bell times. Minor schedule adjustments will also be made.
<br><br>Reason
<br>Alleviate overcrowding per school bell times at John F. Kennedy High School and improve operating conditions by providing additional recovery time for Operators.
<br><br>Survey Results
<br>Out of 21 respondents, 48% reported a positive impact from the change, 29% indicated it had no impact, and 24% perceived the change negatively. Bus 35 |
| - Route 37 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday schedules.
<br><br>Reason
<br>Schedule changes to provide more consistent, evenly spaced service, with buses arriving at approximately the same time each hour.
<br><br>Survey Results
<br>Out of 6 respondents, 50% reported a positive impact from the change, 50% indicated it had no impact, and 0% perceived the change negatively. Bus 37 |
| - Route 42 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor schedule adjustments while reinstating seasonal tripper service.
<br><br>Reason
<br>Improve connections with A Line and operating conditions while aligning with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 7 respondents, 28% reported a positive impact from the change, 57% indicated it had no impact, and 14% perceived the change negatively. Bus 42 |
| - Route 45 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules while reinstating seasonal tripper service.
<br><br>Reason
<br>Improve on-time performance, service reliability and operating conditions while aligning with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 7 respondents, 43% reported a positive impact from the change, 43% indicated it had no impact, and 14% perceived the change negatively. Bus 45 |
| - Route 51 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Reinstate seasonal tripper service while adding both a morning and evening trip to alleviate overcrowding caused by school bell times at John F. Kennedy High School. Trips added are a Southbound 8:05am trip starting at W Dartmouth Ave & S Lamar St (Stop ID: 13281) and a Northbound 4:05pm trip starting at W Dartmouth Ave & S Lamar St (Stop ID: 13282).
<br><br>Reason
<br>Alleviate overcrowding per school bell times at John F. Kennedy High School.
<br><br>Survey Results
<br>Out of 17 respondents, 71% reported a positive impact from the change, 29% indicated it had no impact, and 0% perceived the change negatively. Bus 51 |
| - Route 52 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route 52 stop at 58th Avenue will be relocated to Ralston Road/64th Avenue. Western terminal located at 63rd Avenue and Wright Street will remain in place.
<br><br>Reason
<br>Relocating the stop at 58th Avenue to Ralston Road/64th maintains coverage that would otherwise be lost due to the reroute of the Route 72.
<br><br>Survey Results
<br>Out of 17 respondents, 41% reported a positive impact from the change, 29% indicated it had no impact, and 29% perceived the change negatively. Bus 52 |
| - Route 53 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Extend route to Orchard Pkwy and 144th Ave.
<br><br>Reason
<br>Change was requested by stakeholders and policy makers and will provide paratransit service to The Grove Community.
<br><br>Survey Results
<br>Out of 29 respondents, 89% reported a positive impact from the change, 7% indicated it had no impact, and 3% perceived the change negatively. Bus 53 |
| - Route 59 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Westbound departures from Littleton•Downtown Station will depart from Gate C.
<br><br>Reason
<br>Reduce gate conflicts with Route 30.
<br><br>Survey Results
<br>Out of 15 respondents, 33% reported a positive impact from the change, 67% indicated it had no impact, and 0% perceived the change negatively. Bus 59 |
| - Route 65 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Seasonal tripper service will be reinstated.
<br><br>Reason
<br>Align with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 14 respondents, 28% reported a positive impact from the change, 64% indicated it had no impact, and 7% perceived the change negatively. Bus 65 |
| - Route 72 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route 72 will be extended to serve the Clear Creek Crossing Transit Center in Wheat Ridge via 58th Ave. Five weekday trips will be added (two eastbound and three westbound) to provide earlier morning service and improve connections to Lutheran Hospital.
<br><br>Reason
<br>Provides additional service and improved connections to Lutheran Hospital earlier in the morning and facilitates transfers to the G Line, and Routes 38 and 32.
<br><br>Survey Results
<br>Out of 16 respondents, 88% reported a positive impact from the change, 6% indicated it had no impact, and 6% perceived the change negatively. Bus 72 |
| - Route 73 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Realign routing near Belleview Station (with no changes to current bus stop locations or access). Reinstate seasonal tripper service.
<br><br>Reason
<br>Route change at Belleview to utilize safer turning movements. Align with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 12 respondents, 58% reported a positive impact from the change, 42% indicated it had no impact, and 0% perceived the change negatively. Bus 73 |
| - Route 83L service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route 83L will be extended to serve Union Station from Wade Blank Civic Center Station via 15th and 17th streets.
<br><br>Reason
<br>Requested by policymakers, stakeholders and customers.
<br><br>Survey Results
<br>Out of 35 respondents, 89% reported a positive impact from the change, 6% indicated it had no impact, and 6% perceived the change negatively. Bus 83L |
| - Route 105 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Reason
<br>Improve on-time performance, service reliability, and operating conditions.
<br><br>Survey Results
<br>Out of 9 respondents, 44% reported a positive impact from the change, 22% indicated it had no impact, and 33% perceived the change negatively. Bus 105 |
| - Route 120 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to departure times from Eastlake•124th Station on weekdays, Saturdays and Sundays/Holidays.
<br><br>Reason
<br>Improve on-time performance and service reliability.
<br><br>Survey Results
<br>Since this change was not included in the proposed September Service Changes, no survey data was collected. Bus 120 |
| - Route 120L service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to departure times from Eastlake•124th Station on weekdays, Saturdays and Sundays/Holidays.
<br><br>Reason
<br>Improve on-time performance and service reliability.
<br><br>Survey Results
<br>Since this change was not included in the proposed September Service Changes, no survey data was collected. Bus 120L |
| - Route 153 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Reason
<br>Improve on-time performance, service reliability, and operating conditions.
<br><br>Survey Results
<br>Out of 9 respondents, 33% reported a positive impact from the change, 56% indicated it had no impact, and 11% perceived the change negatively. Bus 153 |
| - Route 204 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor changes to northbound running times between 7 a.m. – 10 a.m.
<br><br>Reason
<br>Improve on-time performance, service reliability, and operating conditions.
<br><br>Survey Results
<br>Out of 10 respondents, 50% reported a positive impact from the change, 50% indicated it had no impact, and 0% perceived the change negatively. Bus 204 |
| - Route 206 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The southbound 7:57 a.m. trip will change to 7:52 a.m.
<br><br>Reason
<br>Account for traffic delays due to 8:30 a.m. school start time.
<br><br>Survey Results
<br>Out of 6 respondents, 50% reported a positive impact from the change, 50% indicated it had no impact, and 0% perceived the change negatively. Bus 206 |
| - Route 225 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route 225 will be adjusted to return service to Willoughby Corner before 7 a.m. and after 7 p.m. while reinstating fall/winter service levels.
<br><br>Reason
<br>Adjust service reflects improved operating conditions while aligning service levels with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 21 respondents, 71% reported a positive impact from the change, 24% indicated it had no impact, and 5% perceived the change negatively. Bus 225 |
| - Route 323 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The 5:52 p.m. weekday, eastbound trip from Bent/Dry Creek will be adjusted to depart at 6 p.m.
<br><br>Reason
<br>Allows for improved connections at 8th Avenue and Coffman Street.
<br><br>Survey Results
<br>Out of 10 respondents, 40% reported a positive impact from the change, 60% indicated it had no impact, and 0% perceived the change negatively. Bus 323 |
| - AB1 and AB2 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Schedules will be adjusted to align trips arriving at Table Mesa Park-n-Ride into a consistent 30-minute, clock-face pattern (:00 and :30), with trips departing 5 minutes after arrivals.
<br><br>Reason
<br>Create more consistent headways from Table Mesa PnR to Denver International Airport
<br><br>Survey Results
<br>Out of 44 respondents, 81% reported a positive impact from the change, 16% indicated it had no impact, and 2% perceived the change negatively. Bus AB2Bus AB1 |
| - ART service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Current northbound detour will be made permanent.
<br><br>Reason
<br>Accommodates new traffic-calming infrastructure maintaining safe, reliable operations.
<br><br>Survey Results
<br>Out of 19 respondents, 53% reported a positive impact from the change, 47% indicated it had no impact, and 0% perceived the change negatively. Bus ART |
| - DASH service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Service will be reinstated to Willoughby Corner before 7 a.m. and after 7 p.m., with minor schedule adjustments and reinstatement of fall/winter service levels.
<br><br>Reason
<br>Improves on-time performance, service reliability and operating conditions while supporting seasonal ridership levels.
<br><br>Survey Results
<br>Out of 20 respondents, 75% reported a positive impact from the change, 25% indicated it had no impact, and 0% perceived the change negatively. Bus DASH |
| - FreeRide service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor schedule adjustments to weekend service.
<br><br>Reason
<br>Improve on-time performance.
<br><br>Survey Results
<br>Out of 37 respondents, 60% reported a positive impact from the change, 38% indicated it had no impact, and 3% perceived the change negatively. Bus FreeRide |
| - JUMP service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Route will also serve paratransit customers at Gate J at Downtown Boulder Station, while Gate M will remain departure gate.
<br><br>Reason
<br>Improve safety and accessibility by providing safer bus turn movements and dedicated access to Gate J for paratransit customers who have difficulty crossing Canyon Street, while aligning service levels with seasonal demand.
<br><br>Survey Results
<br>Out of 29 respondents, 45% reported a positive impact from the change, 48% indicated it had no impact, and 6% perceived the change negatively. Bus JUMP |
| - LD1 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The 5:30 p.m. departure from Union Station will change to 5:40 p.m.
<br><br>Reason
<br>Better align with travel patterns and other departure times at Union Station.
<br><br>Survey Results
<br>Out of 74 respondents, 48% reported a positive impact from the change, 45% indicated it had no impact, and 8% perceived the change negatively. Bus LD1 |
| - LX2 service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The 4:06 p.m. departure from Union Station will change to 4:20 p.m.
<br><br>Reason
<br>Better align with travel patterns and other departure times at Union Station.
<br><br>Survey Results
<br>Out of 80 respondents, 48% reported a positive impact from the change, 46% indicated it had no impact, and 6% perceived the change negatively. Bus LX2 |
| - SKIP service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Minor adjustments to weekday schedules while reinstating fall/winter service levels.
<br><br>Reason
<br>Improve on-time performance while aligning with seasonal ridership levels.
<br><br>Survey Results
<br>Out of 11 respondents, 63% reported a positive impact from the change, 36% indicated it had no impact, and 0% perceived the change negatively. Bus SKIP |
| - C Line service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The C Line will be permanently reinstated once the Downtown Rail Reconstruction Project is complete.
<br><br>Reason
<br>The C Line provides a stable and consistent service pattern between Littleton•Mineral Station and Union Station to enhance the customer experience.
<br><br>Survey Results
<br>Out of 264 respondents, 85% reported a positive impact from the change, 2% indicated it had no impact, and 13% perceived the change negatively. Tram C |
| - D Line service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The D Line, which is currently not operating, will be permanently discontinued once the Downtown Rail Reconstruction Project is complete.
<br><br>Reason
<br>Permanent reinstatement of the C Line will provide service between Littleton•Mineral Station and Union Station, and provide the ability to transfer to rail lines serving the Downtown Loop via the I-25•Broadway, Alameda, and 10th•Osage stations.
<br><br>Survey Results
<br>Out of 265 respondents, 11% reported a positive impact from the change, 7% indicated it had no impact, and 82% perceived the change negatively. Tram D |
| - R Line service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>One-minute adjustment to weekday, Saturday, and Sunday/Holiday schedules.
<br><br>Reason
<br>Account for schedule changes to the T Line.
<br><br>Survey Results
<br>Since this change was not included in the proposed September Service Changes, no survey data was collected. Tram R |
| - T Line service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>The T Line (Temporary Line) will be extended northbound to serve Alameda Station, along with minor changes to weekday, Saturday, and Sunday/Holiday schedules.
<br><br>Reason
<br>Provide additional Operator recovery time and improve customer connections between the T, C and E lines.
<br><br>Survey Results
<br>Out of 36 respondents, 53% reported a positive impact from the change, 28% indicated it had no impact, and 19% perceived the change negatively. Note: Extension of the T Line to Alameda Station was not part of the Proposed Service Change. Tram T |
| - A Line service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Change
<br>Schedule adjustments, modifying early morning and evening service frequencies as follows: 3 a.m. to 6 a.m.: 30-minute frequency 6:15 a.m. to 7:30 p.m.: 15-minute frequency 7:30 p.m. to end of service: 30-minute frequency (as compared to current schedule, which transitions to 30-minute frequency beginning with the 6:30 p.m. departure from Union Station and the 7:27 p.m. departure from Denver Airport). These changes to schedule timing will also result in the loss of (2) daily morning trips, the 5:45 a.m. eastbound and the 6:42 a.m. westbound.
<br><br>Reason
<br>Adjusting the span of 15-minute service better aligns frequency with customer demand by providing more frequent service later into the evening. Schedule changes also create more consistent departure times during periods of 30-minute service, making the schedule easier to understand while improving operational efficiency and better aligning service with contractual requirements.
<br><br>Survey Results
<br>Out of 152 respondents, 40% reported a positive impact from the change, 28% indicated it had no impact, and 32% perceived the change negatively. Train A |
| - Route 0B service change: beginning Sun Sep 27. UNKNOWN_CAUSEUNKNOWN_EFFECT | Service Change
<br>Minor changes to weekday, Saturday and Sunday/Holiday schedules.
<br><br>Service Change Reason
<br>Schedule changes will eliminate overlap with Route 0L.
<br><br>Survey Results
<br>Since this change was not included in the proposed September Service Changes, no survey data was collected. Bus 0B |
| - The following stop is closed daily from 7:00 AM - 3:30 PM Fri Sep 18 to Thu Oct 29 due to construction: W Alameda Ave & S Harlan St (#12005) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>3
<br><br>Available alternate stops:
<br>W Alameda Ave & S Depew St (#11980)
<br>W Alameda Ave & S Lamar St (#12031) Bus 3 |
| - Route 9 detoured from Fri Sep 18 through Fri Oct 9 due to road closure on Santa Fe Dr between 9th Ave & 10th Ave OTHER_CAUSEDETOUR | Affected direction: Eastbound
<br><br>Affected stops:
<br>W 9th Ave & Mariposa St (#20124)
<br>W 9th Ave & Kalamath St (#20125)
<br><br>Available alternate stops:
<br>Mariposa St & W 8th Ave (#24371)
<br>Santa Fe Dr & W 11th Ave (#16418) Bus 9 |
| - Change at Decatur-Federal Station Park-n-Ride lot. UNKNOWN_CAUSEUNKNOWN_EFFECT | Effective September 1st, 2026, RTD is no longer affiliated with the Park-n-Ride lot at this station. Parking at this lot will be managed by Empower Field and associates, RTD parking policies will no longer be accepted. Alternative parking options are available at the Sheridan Station Garage or at the I-25 / Broadway Station.
<br><br>Bus and light rail services continue to operate at the Decatur-Federal Station as scheduled. Bus 16Tram WBus 20Bus 30Bus 10Bus 31 |
| - ART detoured from Mon Sep 28 through Wed Oct 14 due to road closure on York and Josephine at 40th Ave for construction. OTHER_CAUSEDETOUR | Affected stops:
<br>Josephine St & 40th Ave (#14712) (northbound)
<br>Josephine St & 43rd Ave (#14713) (northbound)
<br>York St & 43rd Ave (#17408) (southbound)
<br>York St & 40th Ave (#11103) (southbound)
<br><br>For northbound ART get on/off buses at:
<br>40th Ave & York St (#11104)
<br>Josephine St & 45th Ave (#14714)
<br><br>For southbound ART get on/off buses at:
<br>York St & 45th Ave (#17409) Bus ART |
| - The following stops are closed from Mon Sep 28 through Wed Oct 14 due to construction: W Mississippi Ave & S Quivas St (#15434) (eastbound) and W Mississippi Ave & S Quivas St (#15434) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>11
<br>14
<br><br>Available alternate stops:
<br>W Mississippi Ave & S Mariposa St (#15405) (eastbound)
<br>W Mississippi Ave & S Mariposa St (#15404) (eastbound) Bus 11Bus 14 |
| - The following stops are closed due to construction: University Blvd & Cherry Creek North Dr (#16814) (eastbound) and University Blvd & Cherry Creek North Dr (#16814) (northbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>3
<br>24
<br><br>Available alternate stops:
<br>Temporary stop south of Cherry Creek North Dr.
<br>S University Blvd & Alameda Ave (#16801) (northbound)
<br>Josephine St & 1st Ave (#16790) (northbound)
<br>S University Blvd & Alameda Ave (#16801) (eastbound)
<br>1st Ave & University Blvd (#10480) (eastbound) Bus 24Bus 3 |
| - A Line service change: 30-minute frequency from Tue Sep 29 at 12:00 PM through Sat Oct 10 due to maintenance. MAINTENANCEUNKNOWN_EFFECT | RTD will implement a temporary 30-minute service frequency on the A Line, seven days a week, to accommodate repairs by agency concessionaire operator Denver Transit Partners at the York/Josephine railroad crossing. The adjusted schedule begins with the noon departure from Denver Union Station on Tuesday, Sept. 29, and will remain in effect through Saturday, Oct. 10.
<br><br>Bus shuttles will not be used during this extended service interruption to allow RTD customers to continue traveling between Union Station and Denver International Airport by rail, eliminating the need to alternate between rail and bus services. Trains will use a single track in some locations while construction at the York/Josephine crossing is underway. Train A |
| - Board A Line on track 1 from Tue Oct 06 at 03:00 AM through Sat Oct 10 due to maintenance. MAINTENANCEOTHER_EFFECT | Affected stops:
<br>38th / Blake Station
<br>40th / Colorado Station Train A |
| - The following stops are closed from Tue Oct 6 through Wed Dec 16 due to construction: S Broadway & Table Mesa Dr (#12604) (northbound) and S Broadway & Table Mesa Dr (#12604) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>DASH
<br>GS
<br>SKIP
<br>AB1
<br>FF1
<br>FF2
<br>FF5
<br><br>Available alternate stops:
<br>Table Mesa Dr & Tantra Dr (#16685) (westbound)
<br>Broadway & Dartmouth PnR (#12512) (westbound)
<br>Table Mesa Dr & 40th St (#16681) (westbound)
<br>S Broadway & Darley Ave (#19182) (northbound)
<br>Broadway & Dartmouth PnR (#12512) (northbound)
<br>Table Mesa Dr & S Broadway (#16686) (northbound) Bus FF2Bus AB1Bus DASHBus GSBus SKIPBus FF1Bus FF5 |
| - The following stops are closed from Mon Oct 5 through Thu Nov 12 due to construction: Nine Mile Station Gate F (#26196) (eastbound) and Nine Mile Station Gate F (#26196) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>83D
<br>83L
<br><br>Alternate boarding: Nine Mile Station Gate E (#26598) Bus 83LBus 83D |
| - The following stop is closed through Tue Oct 13 due to construction: 13500 Block Via Varra (#35483) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>AB1
<br>AB2
<br>AB3
<br><br>Available alternate stop:
<br>US 36 & Flatiron Station Gate A (#34657) (eastbound) Bus AB3Bus AB2Bus AB1 |
| - The following stop is closed from Mon Oct 5 through Thu Nov 19 due to construction: Colfax Ave & Laredo St (#12925) (westbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>15
<br><br>Available alternate stops:
<br>Colfax Ave & Norfolk St (#12940)
<br>Colfax Ave & Jasper St (#21520) Bus 15 |
| - Route 105 detoured from Tue Sep 29 through Fri Oct 16 due to road closure at the intersection of Havana St and Colfax Ave OTHER_CAUSEDETOUR | Affected stops:
<br>Havana St & Colfax Ave (#14256) (northbound)
<br>Havana St & 17th Ave (#14234) (southbound)
<br><br>For northbound Route 105 get on/off buses at:
<br>Havana St & 13th Ave (#14228)
<br>Havana St & 17th Ave (#14233)
<br><br>For southbound Route 105 get on/off buses at:
<br>Havana St & Montview Blvd (#14280)
<br>Havana St & Colfax Ave (#14257) Bus 105 |
| - NB1 service to Eldora Mountain Resort expected to begin mid November, 2026. UNKNOWN_CAUSENO_SERVICE | Affected stops:
<br>Eldora Mountain Resort (#18032) (eastbound) Bus NB1 |
| - The following stop is closed from Mon Oct 5 through Fri Dec 11 due to construction: Hover St & 20th St (#23262) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>326
<br><br>Available alternate stops:
<br>Hover St & 21st Ave (#22500)
<br>Hover St & Wedgewood Ave (#34171) Bus 326 |
| - DASH detoured through Wed Oct 14 due to construction. CONSTRUCTIONDETOUR | Affected stops:
<br>W Pine St & Tyler Ave (#21644) (eastbound)
<br>W Pine St & Hoover Ave (#21645) (eastbound)
<br>Pine St & Johnson Ave (#21646) (eastbound)
<br>Pine St & Grant Ave (#21647) (eastbound)
<br>Pine St & Jefferson Ave (#21650) (westbound)
<br>Pine St & Johnson Ave (#21651) (westbound)
<br>W Pine St & Hoover Ave (#21652) (westbound)
<br><br>For eastbound DASH get on/off buses at:
<br>W Pine St & S Polk Ave (#21643)
<br>Main St & Spruce St (#17881)
<br><br>For westbound DASH get on/off buses at:
<br>Main St & Spruce St (#17903)
<br>W Pine St & Tyler Ave (#21653) Bus DASH |
| - Pecos Junction Station Elevator unavailable due to mechanical issue. MAINTENANCEOTHER_EFFECT | Bus shuttles are available to take customers to next accessible station. If exiting train at this station please notify operator if you require use of the elevator. Bus 19Train BTrain G |
| - Dry Creek Station West Elevator unavailable due to mechanical issue. MAINTENANCEOTHER_EFFECT | Bus shuttles are available to replace bridge access to the station. Tram TTram RTram E |
| - The following stop is closed through Mon Oct 19 due to construction: W Oxford Ave & S Navajo St (#34565) (southbound). CONSTRUCTIONNO_SERVICE | Affected routes:
<br>51
<br><br>Available alternate stops:
<br>W Oxford Ave & S Natches Ct (#25032)
<br>S Kalamath St & W Oxford Ave (#34566) Bus 51 |
| - Route 28 detoured due to road closure. OTHER_CAUSEDETOUR | Affected stops:
<br>29th Ave & Elm St (#10748) (westbound)
<br><br>Available alternate stops:
<br>29th Ave & Forest St (#10755)
<br>29th Ave & Dahlia St (#10745) Bus 28 |
| - Route 28 detoured beginning at 8:02 AM. UNKNOWN_CAUSEDETOUR | Affected direction: Eastbound
<br><br>Affected stops:
<br>29th Ave & Dexter St (#10747)
<br>29th Ave & Fairfax St (#10749)
<br>29th Ave & Forest St (#10754)
<br><br>Available alternate stops:
<br>29th Ave & Forest St (#10755)
<br>29th Ave & Dahlia St (#10745) Bus 28 |
| - The following stop is closed due to road closure: Quincy Ave & Smoky Hill Rd (#16219) (eastbound). OTHER_CAUSENO_SERVICE | Affected routes:
<br>139 Bus 139 |
to leave a review, go through registration
for entering numbers, registration is required registration