commencement - end / header / cause / effect | description |
---|---|
- Route 169 – temporary changes and metro vehicle preview OTHER_CAUSEMODIFIED_SERVICE | From Monday 21 October, metro vehicles will run on route 169 as part of a preview phase for the Brisbane Metro.To catch a metro vehicle, hail the service like you would a bus or use the help phone on the platform to request the service. |
- Mowbray Park ferry terminal upgrade CONSTRUCTIONSTOP_MOVED | On Monday 8 April, Mowbray Park ferry terminal will close for approximately nine months for a major upgrade.Once complete, the new terminal will allow for two CityCats to dock at the same time, improving travel times. The new terminal will also have improved accessibility and covered waiting ar Aqua-bus UQSLAqua-bus NHAM |
- King George Square and Queen Street bus stations - stop changes CONSTRUCTIONSTOP_MOVED | Temporary bus stop arrangements are in place at King George Square and Queen Street bus stations to enable Brisbane Metro construction works. While both stations remain open during these works, some bus services have moved from King George Square station and Queen Street bus station to other ne |
- Burpengary station reopening CONSTRUCTIONSTOP_MOVED | Burpengary station reopened on Monday 9 September!Replan your travel to make the most of your new station. Bus R604Train BRCATrain BRGYTrain BRNATrain CABRTrain CAIPTrain CARWTrain CASPTrain GYBRTrain IPCATrain IPNATrain NABRTrain NAIPTrain NASPTrain RWCATrain RWNATrain RWRPTrain SPCATrain SPNABus R585 |
- Lindum station upgrade CONSTRUCTIONSTOP_MOVED | From Monday 22 January 2024 until late-2024, Lindum station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Lindum for the duration of the works. While the station is closed, alternative transport options will be available; includ Train CLDBTrain CLSHBus R581Bus R604Train DBCLTrain CLBRBus R348Bus R585Bus R295Bus R296Train SHCLTrain BRCL |
- Reduced service - Route 700 OTHER_CAUSEREDUCED_SERVICE | Multiple route 700 services in both directions have been cancelled due to staff availability.Departing Tweed Heads:11:13pm1:23am3:53amDeparting Broadbeach South station:10:33pm12:18am3:03am4:33amPlease check the journey planner for alternative travel options. Bus 700 |
- Weekend track closure - Ipswich-Rosewood and Springfield lines CONSTRUCTIONREDUCED_SERVICE | Track closure in briefStart: 12:30am on Saturday 26 OctoberEnd: Last service Sunday 27 OctoberAffected lines: Ipswich/Rosewood and SpringfieldNext normal service: First train on Monday 28 October Bus R604Train BRRWTrain BRIPTrain BRSPTrain CASPTrain CAIPTrain CARWTrain IPCATrain IPNATrain IPRPTrain NAIPTrain NASPTrain RWBRTrain IPBRTrain IPRWTrain RPIPTrain RPSPTrain RWCATrain RWNATrain RWRPTrain SPCATrain SPNATrain SPRPBus R585Train RWIPBus R592Bus R594Bus R595Bus R596Bus R597Bus R598Bus R599Train SPBR |
- Dutton Park station reopening OTHER_CAUSEMODIFIED_SERVICE | Dutton Park station will reopen on Monday 21 October, with construction works continuing until late-2025.You can access the station via stairs and lifts from the Annerley Road, and Noble Steet station entries.Access from Kent Street will remain closed until works in that area of the station are comp Train DBBNBus R591Bus R604Train FGBNBus R585Train BNBRTrain BNFGTrain BRBN |
- Route 196 stop changes - Valley Fiesta event DEMONSTRATIONSTOP_MOVED | On Saturday 26 October there will be changes to route 196 in Fortitude Valley due to the Valley Fiesta event.If you normally catch your service from the following stops, please use the alternatives shown below. |
- Yeerongpilly station - extended closure CONSTRUCTIONSTOP_MOVED | On Monday 18 September 2023, Yeerongpilly station closed for important Cross River rail upgrade works. Train DBBNBus R591Bus R604Train FGBNBus R585Train BNBRTrain BNFGTrain BRBN |
- Banyo station upgrade CONSTRUCTIONSTOP_MOVED | From Monday 22 January 2024 until late-2024, Banyo station will close for a major station accessibility upgrade. This means Shorncliffe line services will not stop at Banyo for the duration of the works. While the station is closed, alternative transport options will be available; includ Train CLSHBus R604Bus R348Bus R585Train SHBRTrain SHCLTrain BRSH |
- Get onboard your new northern Gold Coast bus routes OTHER_CAUSEADDITIONAL_SERVICE | From Monday 19 June, you'll have access to two new bus routes in Coomera and Pimpama: 720 - Coomera station to Pimpama City Shopping Centre 724 - Coomera station to Pimpama Sports Hub With lots of new stops, we're making it easier for you to get around your neighbourhood or connect with Bus 721Bus 720Bus 724 |
- Gold Coast Highway, Mermaid Waters - minor delays CONSTRUCTIONUNKNOWN_EFFECT | From July 2023 until mid-November 2024, routes 700 and 777 may experience minor delays between Broadbeach South Station and Burleigh Heads, due to works on the Gold Coast Highway as part of the Gold Coast Light Rail Stage 3 project.Please allow extra travel time during this period.W Bus 700Bus 777 |
- Bundamba station upgrade CONSTRUCTIONSTOP_MOVED | Bundamba station reopened on Monday 21 October!Replan your travel to make the most of your new station. Bus R604Train BRRWTrain BRIPTrain CAIPTrain CASPTrain CARWTrain IPCATrain IPNATrain IPRPTrain NAIPTrain NASPTrain RWBRTrain IPBRTrain IPRWTrain RPIPTrain RWCATrain RWNATrain RWRPTrain SPCATrain SPNABus 502Bus 503Bus R585Train RWIPBus R592Bus R594Bus R595Bus R596Bus R597Bus R598Bus R599 |
- Morningside station upgrade CONSTRUCTIONSTOP_MOVED | From Monday 22 January 2024 until late-2024, Morningside station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Morningside for the duration of the works. While the station is closed, alternative transport options will be available; Train CLDBTrain CLSHBus R581Bus R604Train DBCLTrain CLBRBus R348Bus R585Bus R295Bus R296Train SHCLTrain BRCL |
- Buranda train station upgrade CONSTRUCTIONSTOP_MOVED | From Monday 8 January 2024 until 2025, Buranda train station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Buranda for the duration of the works. While the station is closed, alternative transport options will be available Train CLDBTrain CLSHBus R581Bus R604Train DBCLTrain CLBRBus R348Bus R585Bus R295Bus R296Train SHCLTrain BRCL |
- Gold Coast 500, Main Beach - temporary stop closures DEMONSTRATIONSTOP_MOVED | Between Tuesday 1 October and Wednesday 6 November the following stops will be closed for the Gold Coast 500.During this time, if you travel on routes 700, 704, 705 or school routes please use the alternative stops below. Bus 705 |
- King George Square station - entrance closure CONSTRUCTIONOTHER_EFFECT | From 8pm Wednesday 30 March, station modification works for the Brisbane Metro project will start at King George Square station. Because of this, the station entrance on Adelaide Street (closest to Brisbane City Hall) will temporarily close until 2024. |
- Wardoo Street and Cotlew Street, Ashmore - temporary stop closures CONSTRUCTIONSTOP_MOVED | From Monday 29 April until late December, the following stops will be closed due to roadworks.During this time, if you travel on routes 737, 741 and school services, please use the alternative stops shown below. |
- Brisbane Street, Beaudesert - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Monday 5 August to mid-November, the stop on Brisbane Street at Eaglesfield Street will be closed due to roadworks.During this time, if you travel on route 540, please use the alternative stop near Tubber Street shown below. |
- Stops missed - Route 600 POLICE_ACTIVITYDETOUR | Route 600 in both directions will be temporarily missing the below stops due to an incident requiring emergency services. |
- Redland Bay Road, Victoria Point - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Tuesday 23 April to late October, the stop on Redland Bay Road at Magnolia Parade (near Renaissance Retirement Village) will be closed as part of the Cleveland-Redland Bay Road upgrade.During this time, if you travel on routes 250, 270, 272, 279, 280, 281, BU |
- MacArthur Avenue, Hamilton - temporary stop closure OTHER_CAUSESTOP_MOVED | From Monday 14 October to Friday 8 November, the stop on MacArthur Avenue at Old Shoreline will be closed due to excavation works.During this time, if you travel on route 304 or 305 please use the stop on MacArthur Avenue at Northshore Ferry stop below. |
- Brisbane Road, Mooloolaba - temporary stop closure OTHER_CAUSESTOP_MOVED | From Monday 9 October 2023 until further notice, the stop on Brisbane Road at Mooloolaba Bowls Club will be closed due to issues with bus travel along Foote Street. During this time, if you travel on routes 600, 611, 615, please use the alternative stops belo |
- Newdegate Street, Greenslopes - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Friday 18 October to Sunday 7 December, stop 22 on Newdegate Street near Denman Street will be closed due to construction.During this time, if you travel on route 172 or P173, please use stop 23 on Newdegate Street at Greenslopes Hospital shown below. |
- Beenleigh line timetable changes - Fairfield to Salisbury CONSTRUCTIONMODIFIED_SERVICE | Until mid-2025, there will be changes to some Beenleigh services in the afternoon peaks due to important Cross River Rail works.Some peak services will run express through two or more of the following stations - Fairfield, Yeronga, Moorooka and Salisbury. If you live close to a StationLink |
- Health Care Drive, Springfield Central - temporary stop closure MAINTENANCESTOP_MOVED | Until November 2024, ??????the stop on Health Care Drive at Mater Private Hospital will be closed due to construction.During this time, if you travel on route 533, please use the alternative stop at UniSQ shown below.Map legend Closed stopHealth Care Dr at Mater Private Hospital (Sto |
- King Street, Caboolture - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Monday 8 October until Saturday 30 November the King Street at Maple Lane, Caboolture stop will be closed due to construction.During this time, if you travel on route 653, 7016 and 7222 please use the temporary stop outside 170 King Street, approximately 85m away. |
- Edward Street, Brisbane City - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Friday 28 June to Friday 1 November, stop 146 on Edward Street near Margaret St will be closed due to demolition works.During this time, if you travel on route 40, please use stop 96A on Alice Street shown below. |
- Pacific Parade, Currumbin - temporary stop closure CONSTRUCTIONDETOUR | From Monday 6 May until late-2024, the stop on Pacific Parade at Currumbin Beach will be closed due to Gold Coast City Council works on the seawall.During this time, if you travel on route 767, 768 or school services, please use the alternative stop on Pacific Parade nearby Murraba |
- Redbank Plains Road, Bellbird Park - stop changes CONSTRUCTIONSTOP_MOVED | Until mid-December 2024, the following stops on Redbank Plains Road will be impacted by roadworks.If you travel on route 524 or school services, please check the alternative stops shown below. |
- First Avenue, Caloundra - temporary stop closures CONSTRUCTIONSTOP_MOVED | From Monday 12 August until Monday 11 November, the following First Avenue stops will be closed due to roadworks.During this time, if you travel on routes 606 or 609, please use the alternative stops shown below. |
- Lift outage - Helensvale station, footbridge to G:link platform MAINTENANCENone | The lift on the footbridge to the G:link platform at Helensvale station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified. |
- Fryar Road and Logan Road, Eagleby - temporary stop closures CONSTRUCTIONSTOP_MOVED | Between Thursday 24 October and Thursday 14 November, some stops in Eagleby will be closed due to roadworks.During this time, if you travel on routes 563, 564 or 568, please use the alternative stops shown below. |
- Redland Bay Road, Victoria Point - temporary stop closures CONSTRUCTIONSTOP_MOVED | Until February 2025, the following Redland Bay Road stops will be closed due to roadworks.During this time, if you travel on route 250, 272, 280, 281, 282 or school routes please use the alternative stops below. |
- Roma Street station entrance changes CONSTRUCTIONDETOUR | From Friday 26 May 2023, access to Roma Street station will change.Access to all train platforms, busway platform 2 and the Coach Terminal will be via the new entrance, located on Roma Street about 100 metres west towards Suncorp Stadium.Access to busway platform 1 will remain in its current lo |
- Lift outage - Mitchelton station, Kedron Ave entry to footbridge TECHNICAL_PROBLEMNone | The lift at the Kedron Ave entry to the footbridge at Mitchelton station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified. |
- Gold Coast Highway - temporary stop closures CONSTRUCTIONSTOP_MOVED | Due to Gold Coast Light Rail works, several stops along the Gold Coast Highway will be temporarily closed.If you travel on routes 700, 765 or school services, your journey may be impacted by these stop closures. Please see below for a list of stops affected, their closure dates, and |
- Adelaide Street, Brisbane City - evening stop closures CONSTRUCTIONSTOP_MOVED | From Sunday 18 February until late 2024, all bus stops on Adelaide Street, located between George Street and Albert Street, will close between 7pm and 5am, Sunday to Thursday.During these times your bus service will move to alternative stops nearby on Adelaide Street, between Albert Street and Edwar |
- Workshops Street, Brassall - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Tuesday 1 October until Friday 1 November the following stop will be closed for a bus stop upgrade.During this time, if you travel on route 512 and 6215, please use the alternative stop shown below. |
- Helensvale Road, Helensvale - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Wednesday 4 September 2024 to Thursday 30 January 2025, the stop on Helensvale Road at Monterey Keys Drive will be closed due to roadworks.During this time, if you travel on route 718 or school services, please use the temporary stop shown below. |
- Temporary route 501 removal - Bundamba station reopened CONSTRUCTIONMODIFIED_SERVICE | On Monday 21 October Bundamba station reopened following a major accessibility upgrade. During the station upgrade temporary railbus route 501 replaced train services between Bundabma and Booval stations. Route 501 was removed after the last scheduled service on Sunday 20 October. |
- Coonan Street, Indooroopilly - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Monday 17 June until early November the following stop on Coonan St near Belgrave Rd, stop 21 (Stop ID 001670) will be closed due to Indooroopilly roundabout upgrade works.During this time, if you travel on routes 105, 106, 108, 433, 445 or S799 please u |
- Broadbeach South station - crossing and platform changes CONSTRUCTIONOTHER_EFFECT | Works to connect the existing tram network and Gold Coast Light Rail Stage 3 (GCLR3) track extension started on Sunday 3 March at Broadbeach South station, with the installation of water barricades, fencing and other initial construction activities.At this stage there are no changes to tram times or |
- Woolloongabba station - platform 2 access changes CONSTRUCTIONDETOUR | From Monday 25 September 2023 until mid-2024, access to platform 2 at Woolloongabba station will change as construction of the new Cross River Rail Woolloongabba station progresses.The footpath between Woolloongabba station platform 2 and Main Street will temporarily close.Access to platform 2 will |
- Loganlea Road, Meadowbrook - temporary stop closure CONSTRUCTIONSTOP_MOVED | From Monday 20 May until late October, the following stop on Loganlea Road near Ellerslie Road will be closed due to roadworks.During this time, if you travel on routes 560, 562, 568 or school services please use the temporary stop past University Drive shown below. |